W3matchJoin

RWA Daily, edition 1

RWA Daily: Three central banks test coordinated FX settlement

Edition 14 November 20264 min read3 sources

In one minute

The Bank of England, Singapore and Thailand tested coordinated foreign exchange settlement across different central-bank test systems. The experiment shows a possible route to reduce settlement risk, while leaving legal, operating and production questions open.

The main development

On November 13, the Bank of England, the Monetary Authority of Singapore and the Bank of Thailand published the results of Project Meridian FX APAC. They tested payment-versus-payment foreign exchange settlement and multilateral net FX across three test environments, including conventional real-time gross settlement and distributed-ledger-based systems.

Payment-versus-payment addresses a specific exposure. An institution exchanging two currencies can face a loss if it pays one side and the other party fails before delivering the other. Coordinating the two settlement legs is intended to ensure that one payment happens only when the corresponding payment can also happen. The experiment asks how that coordination could work when the currencies sit on different systems, with different operating rules and technologies.

The technical report describes a simulated Bank of England settlement environment, a prototype Thai tokenised payment system and a Singapore test environment supporting wholesale central bank digital currency. A synchronisation operator coordinates the workflow across these systems. This architecture matters because the three authorities do not need to put every currency on one common ledger to investigate a coordinated transaction.

A central bank settlement system can reserve funds while the wider transaction is checked. Coordination must then account for the status of every participating system. The operational details matter: a participant needs to know when a reservation is firm, how long it can remain in place and what happens when a counterparty or system does not complete its leg. The prototype cancels reservations if a leg fails before settlement. Once the first settlement instruction has been issued, it proceeds rather than trying to reverse the transaction, retrying an unavailable system or escalating for intervention. That technical commitment point is distinct from legal settlement finality.

The project also tested multilateral net settlement. Netting can reduce the amount that participants need to settle compared with processing every obligation separately, subject to the rules and exposures of the arrangement. The trade-off is coordination: a participant's position depends on a group of obligations and on the timing and terms used to calculate them. A design that works in a test still needs governance and contingency arrangements suited to real money.

The Bank of England says it is working toward a live synchronisation service in 2028. Its executive summary states that participation does not imply an equivalent implementation commitment or policy direction from the Singapore or Thai authorities. This was an experiment, not evidence that these three jurisdictions have launched a live shared settlement service.

What it means in practice

For institutions considering tokenised assets, the payment leg can be as important as the asset ledger. A transfer may be technically possible at any time, while cash settlement, legal finality or access to central bank money remains constrained by the systems and participants involved. Coordinating settlement is a potential infrastructure improvement rather than proof that an asset becomes freely tradable or redeemable.

The case for a synchronisation operator is that different systems can keep their own settlement arrangements while exchanging the information needed to coordinate. The practical counterargument is that an additional coordinating layer introduces its own dependencies. Legal treatment, participant access, resilience and responsibility for failures must be resolved before institutions can evaluate a live service.

What to watch next

The concrete milestone is the Bank of England's 2028 target for its live synchronisation service. Before then, the useful evidence would be published operating rules, participating institutions, legal arrangements and tests that show how exceptions are handled. A production date for the other two authorities has not been announced in the project summary.

Sources (3)
  1. Project Meridian FX APACwww.bankofengland.co.uk, Publication date not specified
  2. technical reportwww.bankofengland.co.uk, Publication date not specified
  3. executive summarywww.bankofengland.co.uk, Publication date not specified